INTRODUCTION

Lead Time & Capacity

Beyclean scale water filtration production efficiently, supporting projects from product development to mass manufacturing.

BEYCLEANassemblylineunder600KB

 

 

Contact Us

 

BEYCLEANinjectionmoldingunder600KB

Scalable Production Capacity

 

 

Beyclean integrates injection molding, filter cartridge production, assembly, testing, and quality control to support scalable manufacturing of faucet filters, shower filters, filter cartridges, and other water filtration products.

 

With 1.5M+ units annual production capacity, we support OEM/ODM projects, bulk orders, phased launches, and long-term supply for global brands.

 

 

 

 

OEM Project Timeline

 

 

 

 

 
3D Modeling & Engineering Design

Duration: 10–15 days

Our engineers develop 3D models and optimize product structure, water flow, sealing, filter cartridge integration, and manufacturability. DFM analysis is included before prototyping.

 

Functional Prototype

Duration: 7–10 working days

We create functional prototypes to verify structure, appearance, assembly, water flow, and sealing before mold development.

 
Filter Cartridge Development

Duration: 7–15 working days

Our filtration team develops cartridge structures and filter media based on target contaminants, flow rate, filtration performance, and service-life requirements.

 
Mold Fabrication

Duration: 45–60 days

Production tooling begins after the final design is approved. Each mold is optimized for dimensional accuracy, durability, and stable mass production.

 
Injection Molding

Duration: Varies by complexity and quantity

After tooling is completed, we schedule injection molding based on product structure, materials, surface requirements, and production volume.

 
Trial 1 (T1) – Sample Validation

Duration: 7–10 days

T1 samples are evaluated for dimensions, assembly, sealing, pressure resistance, water flow, and filtration performance before final approval.

 
Mass Production

Typical Duration: 30–45 days

After final approval, BEYCLEAN manages material preparation, molding, filter production, assembly, 100% inspection, packaging, and shipment.

 
 

 

 

BEYCLEANOEMunder600KB

FAQ

What is BEYCLEAN's typical production lead time?

BEYCLEAN's typical mass production lead time is 30–45 days, depending on product type, order quantity, customization, and material availability.

How long does a custom water filtration OEM/ODM project take?

The timeline depends on product complexity. A custom project typically includes 3D engineering, DFM analysis, prototyping, filter cartridge development, tooling, sample validation, and mass production.

What water filtration products can BEYCLEAN manufacture?

BEYCLEAN manufactures faucet filters, shower filters, filtered showerheads, inline shower filters, filter cartridges, and other household and skincare water filtration products.

Can BEYCLEAN support large-volume production?

Yes. With integrated injection molding, filter cartridge production, assembly, testing, and quality control, BEYCLEAN supports scalable OEM/ODM production for global brands and distributors.

 

modular-1
Ready to Plan Your Project?

Tell us your product requirements, target quantity, and customization needs. Our team will evaluate your project and provide an estimated development and production timeline.